Sunday, July 6, 2014

Renovation in Progress (part 3)

Week 3

Our 2-panel windows arrived and our contractors installed them with ease. They then completed the mosaic tiling around the window area and the rest of the kitchen.



Once they have completed the tiling, the down-lights, fans, electrical outlets were installed.



Hubbs decided that we needed a change to the apartment as the wood-laminated flooring would be arriving soon. Since the kitchen area is at it's final, we decided to minimize the side window and do something about our sliding door.




We decided to order another side window similar to our kitchen and change the sliding door to a 3-panel glass door. 

In the meantime, we finished off the guest bathroom :








to be continued